TribLive Logo
| Back | Text Size:
https://staging.triblive.com/local/westmoreland/turnpike-to-close-between-irwin-and-pittsburgh-early-sunday-for-bridge-removal/

Turnpike to close between Irwin and Pittsburgh for bridge removal

Renatta Signorini
By Renatta Signorini
1 Min Read Feb. 15, 2019 | 7 years Ago
| Friday, February 15, 2019 1:30 a.m.

The Pennsylvania Turnpike will be closed for about five hours early Sunday between the Pittsburgh and Irwin interchanges as crews remove a bridge.

The closure is planned from 12:01 a.m. to 5 a.m., depending on the weather.

Crews have been working to replace the bridge that previously carried Trafford-Murrysville Road over the toll road at milepost 59.6 in preparation for a widening project.

The recommended 22-mile detour will take motorists east on Route 22, south on Toll Route 66 and west on Route 30.

The $300 million widening project — set to begin in 2023 — will increase the turnpike from four to six lanes along the 10-mile stretch between the Irwin interchange and the Pittsburgh interchange at Monroeville.


Copyright ©2026— Trib Total Media, LLC (TribLIVE.com)